About

Langat Regional Sewage Treatment Plant

The Langat Regional Sewage Treatment Plant is one of the greater Kuala Lumpur anchor project under Ministry Of Natural Resources, Environment and Climate Change with Sewerage Service Department as the implementing agency.

Design and built based on the experience and success of Tokyo Metropolitan Sewerage Service in Japan, the innovative and modern facility is equipped with green technology initiatives and public facilities that can accommodate sewerage inflow of 207,00 m3/day or 920,000 population equivalent(PE).

Hosted by

More on the Treatment Plant

The catchment area covers 77.6 sq.km, stretching from Batu 11 Cheras to Kajang, comprising of a 7.3 hectare treatment system. This compact and integrated sewage plant is designed to achieve a Standard A, Category 1 water quality, specifically in ammonia removal. It is also an “integrated” space to promote best use of space and carbon reduction by means of Green Technology driven initiatives.

This plant operates using the “deep aeration” method with a Step-Feed Multi-Stage De-Nitrification Process that will reduce carbon and nitrogen discharge effectively. This helps to reduce sewage pollution loading into Sungai Langat and the risk of waterborne diseases arising from inadequately treated sewage.

Our Regional Sewage Treatment Plant uses Green Technology which is renewable and constant. It consists of Bio Gas, Solar Energy, Bio-effluent Reuse and Rainwater Harvesting.

A unique feature of this plant is it provides communities with a range of public recreational amenities such as a community hall, landscaped park, badminton courts and futsal courts built on a stand-alone level on top of the treatment plant.

Technical Tour 2 Programme

Limited to only 40 persons for this tour.

Time

Sewage Treatment Plant Tour Schedule

08.30 am

Participants arrive at WTC KL (taxi drop off point)

09.00 am

Depart from WTC to Langat Regional Sewage Treatment Plant

10.00 am

(i) Welcome and Introduction
(ii) Briefing by IWK

10.30 am

Guided Tour of the Regional Sewage Treatment Plant

12.00 pm

(i) Q&A
(ii) Discussion Session
(iii) Light Refreshment

01.00 pm

End of tour and departs for WTC KL

Technical Tour 2 Site Gallery